Citation
Meijer Sjoerd, Krabbendam Richard (2010) Transport and installation of 14 mooring piles at 1,300 m water depth with a DP2 heavy lift vessel. The APPEA Journal 50, 601-604.
https://doi.org/10.1071/AJ09037
Download the article reference in the following formats: