A SIMPLE SUBSEA COMPLETION ON A NEW HYBRID MUDLINE SUSPENSION SYSTEM
C. A. Bottomley
The APPEA Journal
31(1) 391 - 395
Published: 1991
Abstract
A new subsea completion system has been designed to combine conventional mudline installation of the 30 inch and 20 inch casings, with a new 13⅝ inch mudline housing, new 13⅝ ft inch nominal tubing hanger and seal flange. The 13⅜ inch mudline housing features external running threads and replaces the conventional 13⅜ inch casing hanger, the 13 inch tie back adapter and tubing spool. The new tubing hanger features production annulus access through a vertical bore in the hanger body. The main advantages include increased safety due to decreased diver-assisted operations and cost savings due to easier installation of the system compared to a conventional subsea system.https://doi.org/10.1071/AJ90032
© CSIRO 1991