Register      Login
Australian Energy Producers Journal Australian Energy Producers Journal Society
Journal of Australian Energy Producers
 

Session 25. Oral Presentation for: Toward less carbon-intensive, faster gas-to-market offshore development schemes a case study of using discovered resources in the Bedout Sub-basin

Hongfeng Wu A *
+ Author Affiliations
- Author Affiliations

A Molyneux Advisors Pty Ltd, WA, Australia.




Hongfeng Wu is a Director and Principal Reservoir Engineer at MA and has extensive experience in real-world management of oil and gas assets from exploration, through development, production, and abandonment. With a 27-year career in the Oil and Gas industry, he is well-versed in the multi-faceted decisions required during project management and re-invigoration of old fields. Previously, Hongfeng held senior technical positions at Shell, BP and CNOOC.


Australian Energy Producers Journal 64 https://doi.org/10.1071/EP23393
Published: 7 June 2024

© 2024 The Author(s) (or their employer(s)). Published by CSIRO Publishing on behalf of Australian Energy Producers.

Abstract

Presented on Thursday 23 May: Session 25

The Dorado and Pavo fields in the Bedout Sub-basin of the Roebuck Basin, offshore Western Australia, boast a combined 2C contingent resource of 210 MMbbls of liquid hydrocarbons and 750 bcf of gas. Their discovery represents a significant development opportunity for the Australian offshore, especially given the considerable un-risked Prospective Resources in the basin. However, Dorado faces challenges due to its high volatile oil/high condensate gas ratio gas (wet gas) accumulation and its reservoir pressure exceeding 5500 psia, necessitating a miscible gas injection strategy to maximise liquid recovery. This approach involves energy-intensive gas processing and high-pressure reinjection, leading to substantial greenhouse gas emissions. The CO2 intensity directly from Dorado compressors is estimated at 30–39 kg/bbl – on a project-level nearly double the average unit emissions of many producers. This paper explores alternative development schemes using public domain information and petroleum engineering principles to mitigate technical risks, reduce CO2 emissions, and possibly improve the economics and development timeline of the Dorado and Pavo fields. For Dorado, a simpler scheme focussing on oil production and gas delivery for domestic or liquefied natural gas (LNG) use could significantly reduce emissions. Meanwhile, Pavo might see development via a standalone FPSO, emphasising reservoir energy management through water flooding and produced water disposal, typical of conventional black oil field development. These alternatives aim for a less carbon intensive and economically viable development pathway, setting a precedent for future exploration and development in the basin.

To access the Oral Presentation click the link on the right. To read the full paper click here

Keywords: Bedout Sub-basin, CO2 intensity, development concept, Dorado, offshore, Pavo, Roebuck Basin, volatile oil, Western Australia.

Biographies

EP23393_B1.gif

Hongfeng Wu is a Director and Principal Reservoir Engineer at MA and has extensive experience in real-world management of oil and gas assets from exploration, through development, production, and abandonment. With a 27-year career in the Oil and Gas industry, he is well-versed in the multi-faceted decisions required during project management and re-invigoration of old fields. Previously, Hongfeng held senior technical positions at Shell, BP and CNOOC.