WIRELINE FORMATION-TESTER PERFORMANCE ON THE NORTH WEST SHELF

M. D. Agostini

The APPEA Journal 15(1) 127 - 132
Published: 1975

Abstract

The formation-interval-tester was introduced to the North West Shelf in December, 1970 Originally it was used as a first-look test method, with drill stem testing retained as the standard evaluation technique in all potential reservoir sections. Systematic use of this technique in parallel with drill-stem testing has allowed the accumulation of a significant volume of comparative data. This has provided a unique opportunity to examine the validity of wireline-testing as an alternative to the more traditional method of reservoir evaluation.

The wireline-tester has been found to be a reliable indicator of movable hydrocarbons in reservoir rock, after experience allowed the development of regional interpretation limits. Such variables as gas:oil ratios and oil gravities are determined within acceptable limits of accuracy. Formation pressure determinations are consistent' and are thought to be more reliable than those derived from drill-stem-testing. With the data available it is normally possible to calculate the indicated formation permeability. This however being a single point determination the result is of questionable value. Experience has shown that "order of magnitude" agreement is normally achieved between wireline-tester permeabilities and those determined from drill-stem-testing in the same interval.

The reduction in cost resulting from the application of this technique is particularly significant. Savings may be related directly to the relative reduction in rig time required by this operation compared with that required for drill-stem-testing. As the cost of offshore operations increases rapidly the resultant savings will grow in significance.

Also of concern in all well-testing operations is the risk to which the rig and personnel are subjected. On floating offshore rigs the flowing well condition required by drill-stem-testing requires the acceptance of certain associated risks. Wireline testing is by comparison a risk-free operation.

The recognition of the inherent limits of this approach to well testing is important if satisfactory results are to be achieved. Where the required reservoir parameters are those that can be satisfactorily determined with the wireline tester it offers a real alternative to the more traditional evaluation techniques.